On completion of the Rotherham Project and looking to expand further The Trade Centre UK again brought Orion in to provide our services on their next venture, a showroom fit out in Small Heath, Birmingham.
This site was previously a manufacturing plant which required an extensive strip out of all high level lighting, power distribution and structured cabling.
Over the period of 4 weeks the building was stripped back to brick ready for the fit out.
Again, we worked alongside main contractors Intermec to deliver the project across a 14 week timeline.
Their most ambitious project yet our clients requirements meant the full removal of all external services and new install to match their design.
This included;
Internally another full fit out was required with the construction of;
This project much like the previous two involved us installing brand new LED Lighting throughout the store, New sub main distribution, two new Comms Rooms, a 5m x 3m HD TV Wall at high level in the entrance Atrium, 360 degree LED backlight Advertising boards inside and outside the showroom, New LED External lighting and Security gates and barriers at all entrances.
We provided the following services to TCUK for the duration of the project: